Planning guide

Winter prep: the South Shore checklist.

Eight repairs worth finishing before the first hard freeze. Repairs, flooring and remodeling on the South Shore.

01

Clear gutters and check downspouts

Clogged gutters overflow into fascia and freeze into ice dams at the roof edge. Clear them now, run water through each downspout, and make sure the discharge lands away from the foundation.
02

Find trim rot before the frost does

Probe window sills, corner boards and the bottom of door trim with a screwdriver. Soft spots are rot, and water in rotted wood freezes, expands, and makes the damage bigger every cycle. Small sections are a quick repair now.
03

Secure deck boards and railings

Popped screws, lifting boards and loose railings get worse under snow load and freeze-thaw. Refasten what is sound and replace what is split. A wobbly railing in October is a broken railing in February.
04

Seal the gaps that let water and cold in

Failed caulk around windows, doors and where siding meets trim is an open door for wind-driven rain. Cut out cracked caulk and reseal. New weatherstripping on a drafty exterior door pays for itself in one season.
05

Protect hose bibs and exterior plumbing

Disconnect every hose, shut the interior valve to each exterior faucet if you have one, and drain the line. A frozen hose bib can split a pipe inside the wall, and you will not know until it thaws.
06

Fix trip hazards before they hide under snow

Heaved walkway sections, loose step treads and a wobbly handrail are easy to navigate in daylight and dangerous under two inches of snow. Resetting treads and securing rails is a short job.
07

Look down: basement and crawlspace

Check for damp spots at the foundation walls, make sure window wells are clear, and confirm the sump pump runs if you have one. Winter thaws send a lot of water at foundations that were fine all summer.
08

What to send us

Photos of each trouble spot, a rough count of what needs attention, and your town. We will tell you what the repair scope looks like - materials at cost plus 20% labor, agreed in writing before work starts.
Ready

Want it handled before the freeze?

Send photos and a short description and we will scope the repairs.